Natural gas supply reaches Bathinda refinery
"The 44.26 km pipeline of 12 inch diameter (total capacity - 5 mmscmd) is a spur line of the 500 km Dadri-Bawana-Nangal Pipeline (DBNPL). The natural gas supply tap off is taken from GAIL receiving terminal at NFL, Bathinda," the company said