GSFC shuts down urea-II plant for safety; to face production loss of 10,400 tons neem urea
"Urea-II plant was operating normally at 105 per cent with Titanium MOC lined high pressure Urea Reactor (XUR-101) in service. On 16th July 2022 night shift, the leakage in the bottom thermo well of Urea Reactor (XUR-101) was noticed. "The required actions of safe plant shut down were immediately taken," the regulatory filing said.