Global companies keen to develop Railways' Gujarat loco facility
The trains are to be supplied over an 11-year period from 2023-24 to 2033-34 at the existing rolling stock workshop in Dahod. The workshop was established in 1926 for the periodic overhaul of steam locomotives. It will be upgraded to electric locomotive manufacturing unit with infrastructural improvements.